Inside an NBN node at Umina Beach

NBN: Details of FTTN pilot emerge

Earlier today, NBN Co released the test agreement details for its Fibre to the Node pilot in Umina Beach, NSW and Epping, VIC. After initial delays with negotiation trial access to the copper with Telstra, NBN Co is set to commence the customer trials on or around 1st June 2014.

NBN Co will be conducting main deployment trials, one using a spare copper pair (known as the “Second Line Pilot”) as well as a selected “Single Line Pilot” which will use the existing copper phone line to the home. In a Single Line Pilot, traditional voice services will continue to be delivered from the exchange with the use of a combiner to “inject” VDSL signals into the existing line.

Unlike NBN Co’s FTTN discussion paper as reported by CommsDay, NBN Co will be responsible for a free installation process of both pilots where the new copper pair is terminated a new wall plate for “Second Line Pilot Premises”, or where a splitter is installed for the purposes of a “Single Line Pilot Premises”.

Similar to the FTTB trial, the Retail Service Provider or the end user will provide their own ADSL or NBN Co-approved VDSL modem to connect to the NBN Co FTTN Test Network. During NBN Co’s own shop-front tests in March, it was revealed that a Netcomm NF4V modem router was used.

NBN Co expects these trials to conclude 30th September 2014.

Kenneth Tsang

I'm the author of jxeeno™ blog and co-founder of HSCninja.com. I'm a bit of an #NBN and public transport geek. You can normally find me juggling work and my studies at UNSW where I'm currently completing a degree in Geospatial Engineering.